Infill street of new homes at golden hour
For builders building to sell

From lot to sold, with one team and one model.

Design, development and building permit drawings, and the marketing that pre-sells your units while the City reviews them.

Lot to Sold

Most builders buy design, permit drawings and marketing from three different places, then wait. We do all three from one model.

A new infill development permit in Calgary takes a median of 84 days to a decision. In a Lot to Sold project, your renders, floor plans and film are ready the day the DP is filed, so you can pre-sell or pre-lease during the review instead of after framing.

Because the marketing comes from the permit model, the house your buyers fall for is the house you build. No separate studio, no pictures that don't match, and one point of contact from the first sketch to launch.

84 daysMedian infill DP wait
1 modelFrom drawings to film
Part 9Homes we design
WeeklyCalgary permit tracking
The timeline

The DP review is usually dead time. Here it's your sales window.

Indicative weeks for an infill project that needs a DP. DP and BP medians: City of Calgary open data, new single, semi and rowhouse permits, last 24 months.

Why it pays

What does a month of waiting cost you?

Put in your own numbers. Every month a unit sits unsold, the construction loan keeps charging interest.

1 month(s)
$13,333Interest per month
$13,333Saved by selling sooner

A simple estimate: loan × rate ÷ 12. Your lender's terms will differ.

Start with a free Lot Snapshot
Four steps

A clear deliverable at every step.

  • 0

    Lot Snapshot & Concept Study

    A free one-page summary of what your lot allows and how many units fit, in three business days. To see it, a Concept Study, credited in full to your design, adds massing options, a concept view and rough numbers.

  • 1

    Design to DP

    Two concept options, then one refined scheme. The full development permit set with streetscape and context renders for the City and neighbours, and responses to the detailed review through to decision. 4–6 weeks to filing.

  • 2

    DP to BP

    The building permit set, coordinated with your structural engineer, truss and joist supplier and energy compliance (NBC(AE) 9.36), delivered with our drafting partner under our management.

  • 3

    Pre-Sale Package

    Four exteriors, three interiors, marketing floor plans for up to three unit types, a 20-second film, a listing image set and a one-page feature sheet. Built from the DP model and ready the day the DP is filed.

Paid step by step

30% to start, then a payment at each step: DP filed, BP submitted, marketing delivered. You never pay for a step before the one before it is done.

Start with a Lot Snapshot
Ready to sell

What your buyers see the day the DP is filed.

One set of images, used everywhere: your site sign, your listing and website, and your social feeds.

Now pre-selling
Four townhomes with legal suites
Your company · your number
Designed by Bonavale
Site sign
From $725,000

3 bed · 2.5 bath + legal suite

Pre-construction · completion fall 2027

Listing and website
Instagram and Facebook

Mock-ups made with studio concept images.

Packages

Lot to Sold, from lot to launch.

Request pricing
Building to sell

Lot to Sold: single-family home

One home, with or without a legal suite.

  • Concept Study and two concept options
  • DP set with streetscape renders
  • BP set, coordinated with your engineer
  • Pre-Sale Package, ready at DP filing
Request pricing
Building to sell

Lot to Sold: rowhouse or 4-plex

Four units with suites, designed for DP approval and pre-sales.

  • Concept Study and unit-yield options
  • DP set, context views and shadow study
  • BP set, coordinated with your engineer
  • Marketing for every unit type
Request pricing

Fixed fees, quoted for your project and paid step by step. Building your proven plan on a new lot? Ask about a Repeat Plan. Engineering, energy compliance, surveys and City fees are coordinated by us and billed at cost or by our partners.

Happy with your designer? Keep them.

Send us their drawings and we'll make the marketing: renders, floor plans and film, ready at DP filing.

Visualization packages
Questions

Frequently asked

Can you design a semi or 4-plex without an architect?
In Alberta, most single-family homes, semis, duplexes and small rowhouses fall under Part 9 of the building code and can be designed by a residential designer. Where a project needs an architect’s or engineer’s seal, we coordinate one for you.
How long does a development permit take in Calgary?
For new infill singles, semis and rowhouses, the median over the last two years was 84 days from application to decision (City of Calgary open data). The building permit usually follows in about 30–75 days.
When does the marketing start?
The day your DP is filed. We build the renders, floor plans and film from the DP model while the City reviews it, and update them if the DP changes anything visible.
Do you coordinate engineering?
Yes. We coordinate your structural engineer, truss and joist supplier and energy compliance, and our drafting partner produces the BP set under our management. Engineering is billed by the engineer or passed through at cost.
Can I keep my designer and just buy the marketing?
Yes. Send us their drawings and we’ll quote the Pre-Sale Package for your project.
How do payments work?
30% to start, then a payment at each step: DP filed, BP submitted, marketing delivered. You never pay for a step before the one before it is done.
Your next lot

Send us an address. We’ll tell you what fits.

A one-page summary of what your lot allows and how many units fit, in three business days. Free for builders.